Warragamba Dam Pipeline Coating

The Warragamba Dam Pipeline is the largest in New South Wales, part of a system that provides water to 5.3 million people in the Sydney region. To extend its serviceable life, sections of the 27-kilometre pipeline required recoating with a high-performance, industrial aluminium layer. 


Warragamba’s storage lake is four times larger than Sydney Harbour, and stores around 80 per cent of Sydney’s water. The 2.1 metre diameter pipeline is an integral component of the system, facing harsh environmental conditions, dirt and mould, which eventually cause the deterioration of its coating. 


In collaboration with Diona (now SRG Global), WaterNSW undertook this essential and complex maintenance work rejuvenating portions of the 27-kilometre pipeline. Project scope included the clearing of surrounding vegetation, erecting scaffolding and encapsulation structures for a dry workspace and environmental protection measures, high-pressure washing to determine the condition of existing coating, removal of hazardous old coating, application of zinc primer and protective aluminium topcoats, and joint sealing.  


A combination of durable, high-tech products was utilised in order to provide maximum protection against corrosion. The new coating’s heat reflection properties are highly effective for above-ground pipelines subject to extreme temperature variations of up to 200°C, helping protect the water within the pipeline from contamination. 


Environmental factors were key, limiting the timeframe in which the new coating could be applied following cleaning. Careful measures were undertaken to ensure the protection of nearby waterways and bush, and that all waste was responsibly removed from site. Its rural location also posed challenges for access and resourcing.  


As coating was undertaken on the live pipeline, it was vital that works were effectively managed to ensure there were no disruptions to operations. Particularly important for this project were project scheduling and forecasts, effective coordination of all involved stakeholders, managing complex approvals and maintaining high safety standards. It was also vital that all works were delivered efficiently and with minimal environmental impacts. 


The new coating has significantly extended the pipeline’s life, enhancing its durability, performance and resistance to corrosion, minimising contamination and safeguarding a resilient, reliable water supply for years to come. 

Sector

Water

Client

WaterNSW

Project Value

Undisclosed

Recent Projects